+44 20 3002 7760 info@etap.uk.com ETAP (UK) www.etap.uk.com Authorized ETAP Representative
Slideshow Image 4Slideshow Image 3Slideshow Image 2Slideshow Image 2Slideshow Image 2

ETAP Engineering Consulting Services

Analytical Services

Engineering Consulting Services has been providing services for basic and detailed engineering at optimized costs for the past two decades. OTI has been providing services for basic and detailed engineering at optimized costs for the past two decades.

Real-Time Integration

Real-time system integration often demands a complex interaction between systems and people. The power and versatility of ETAP combined with the vast knowledge and experience of ETAP Solution Providers alleviate the complexities

Dynamic Modeling & Tuning

OTI provides services to build, simulate, and tune control systems for generators in order to obtain maximum accuracy from your ETAP simulations. Control system transfer functions for exciters and governors can be used

GIS Integration

ETAP GIS Map superimposes electrical one-line diagrams with the corresponding geographical maps of power generation, transmission, and distribution systems

Data Import / Export

ETAP Consulting supports clients worldwide in the performing and model validation of database conversions and data exchange projects.We have a staff of engineers and database specialists dedicated to conduct database

Research & Development

Research and development continues to be the force that drives our commitment to be first with technologically advanced simulation tools to meet ever-changing power system requirements. OTI provides services to build

ETAP 7.5 New Features Brochure

Click here to view a full-color detailed brochure describing the dozens of new enhancements that will be included in the new release.

Quality Assurance

  • ISO 9001:2008
    Model for Quality Assurance in Design, Development, Production, Installation and Servicing - ISO 9001:2008 Registered Certification Number 10002889 QM08
  • United States Code of Federal Regulation, Title 10 CFR Part 50, Appendix B
    Quality Assurance Criteria for Nuclear Power Plants and Fuel Reprocessing Plants
  • United States Code of Federal Regulation, Title 10 CFR Part 21
    Reporting of Defects and Noncompliance
  • United States Code of Federal Regulation, Title 10 CFR Part 50.55
    Condition of Construction Permits, Early Site Permits, Combined Licenses, and Manufacturing Licenses
  • ANSI / ASME N45.2 - 1977
    Quality Assurance Program Requirements for Nuclear Facilities
  • ASME NQA-1 (includes Subpart 2.7)
    Quality Assurance Requirements for Nuclear Facility Applications
  • ISO 9001:2008
    Quality Management Systems - Requirements
  • ANSI / IEEE 730.1 - 1989
    IEEE Standard for Software Quality Assurance Plans
  • CAN / CSA-Q 396.1.2 - 1989
    Quality Assurance Program for Previously Developed Software Used in Critical Applications
  • ANSI N45.22 - 1972
    Packaging, Shipping, Receiving, Storage, and Handling of Items for Nuclear Power Plants
UK Clients (Partial)
Global Client List